BACK TO THE BOARD
Product
· SHIPPED FEB
2025

ROLE
Product Designer
TIMELINE
6 months · 2025
TEAM
1 engineer, 1 analyst
TOOLS
Figma, Optimizely, Looker
Checkout converted well enough that nobody wanted to touch it, which is usually where the easiest wins are hiding.
The problem
Leadership wanted a redesign. The data did not support one. Instead of a rebuild I proposed a programme of small, measurable changes with a clear rule: anything that did not beat the control got reverted.
What I did
Twelve experiments over six months, each with a written hypothesis before any design work started. Moving the total above the fold won, a trust badge row did nothing, and an express payment option won by more than everything else combined.
Four of the twelve lost. Documenting those properly turned out to be the more valuable half of the work, because it stopped the same ideas coming back every quarter.
The outcome
A 9% lift in paid conversion with no rebuild and no design debt. The experiment template is still what the team uses to argue for changes.