BACK TO THE BOARD
Product
· SHIPPED SEP
2026

ROLE
Lead Product Designer
TIMELINE
14 weeks · 2026
TEAM
2 engineers, 1 PM, 1 researcher
TOOLS
Figma, Maze, Amplitude
New customers had to hand over an ID, a selfie and three months of statements before they saw a single useful screen. Nearly half of them left somewhere in the middle, and support picked up the rest.
The problem
We assumed the form was too long. Watching twelve sessions told a different story: people stopped because they could not tell why a bank needed any of it. The flow asked for trust without ever earning it.
What I did
I rebuilt the sequence around disclosure. Each step now opens with a plain sentence about what is being checked and why, the document upload moved behind a progress state that survives a refresh, and anything not required by regulation was pushed to a later prompt inside the product.
We shipped it behind a flag to 10% of traffic for three weeks before the full rollout, which caught two edge cases in the document scanner that no amount of prototyping would have surfaced.
The outcome
Drop-off fell by a third and the median completion time went from just over nine minutes to five. The pattern became the house standard for every regulated flow in the product.