BACK TO THE BOARD
Design System
· SHIPPED JUN
2026

ROLE
Design Systems Lead
TIMELINE
6 months · 2026
TEAM
3 designers, 4 engineers
TOOLS
Figma, Storybook, Style Dictionary
Four product teams had drifted into four versions of the same interface. Nine button styles, three date pickers, and a colour palette nobody could name.
The problem
Previous attempts had failed because the system was published and then abandoned. There was no owner, no versioning and no reason for a team under deadline to adopt it.
What I did
We started with an audit instead of a library, mapping every component in production and ranking them by how often they appeared. The first release covered only the eleven that mattered, shipped as tokens, Figma components and coded components in the same week so design and engineering never fell out of step.
Adoption was handled as a service: office hours every Thursday, a migration branch opened by us rather than the product teams, and a changelog that named the person who requested each change.
The outcome
Forty-eight components in six months and all four teams migrated. New feature work that used to take a sprint of interface plumbing now starts with the layout already solved.